Tools:

  • No tools required.

Installing parts:

Procedure:

  1. Position the signal cable deepest in the channel.
  2. Place the power cables on top of the signal cable.
  3. Make sure the power cables run in a straight line.

CAUTION

Incorrect cable routing can make battery installation difficult and can damage the cables.